PATENTED IN-LINE APRO-PIGGING SYSTEM

FOR SEWAGE AND WASTE WATER PIPELINES
Pipelines for transfer of slurry fluids like sewage water and waste water contain a lot of particles that precipitate fast and form thick scale layer on pipe walls in a very short period of time.
This phenomenon causes serious problems that make pipeline facilities of perfect condition have to be abandoned soon after full clogging, which is facilitated more due to their generic characteristics of intermittent flow. In case of long distant transmission pipelines, energy loss due to increased pumping cost deteriorates the problem.
The best way to prevent these problems is to install IN-LINE APRO-PIGGING SYSTEM which provides perfect solution to such pipelines.

EFFECTS AND ADVANTAGES OF IN-LINE APRO-PIGGING SYSTEM

  • Prevent clogging of sewage and waste water pipelines
  • Management for optimum pipeline facility
  • Life of pipeline facility is extended
  • Operable even with less fluid volume than pipeline volume of full length
  • Easy operation
  • Efficient treatment of water of design value in times of heavy rain
  • Reduces putrefactive materials

SYSTEM INFO

TYPICAL MANHOLE INSTALLATION

STANDARD IN-LINE APRO-PIG® SYSTEM
MODEL No. : APRO-SPT-S

IN-LINE APRO-PIG® LAUNCHER TRAP FOR MANHOLE INSTALLATION
MODEL No. : APRO-SPT-M

CAGE TYPE IN-LINE APRO-PIG® RECEIVER TRAP
MODEL No. : APRO-SPT-RV

SCALE DEPOSIT ON PIPE WALL

DISCHARGED SCALE

DISCHARGING WATER DURING CLEANING

AFTER CLEANING

  • System and product data sheets are available on request.
  • Pig locator for sewage and waste water pipeline pigging systems is available.